The Engineer’s Estimate is an important part of the overall design process and implementation of the project. It is a determination of the construction costs for any given project. Here you can find cost estimates (without profit and overhead of the project) direct costs of each item for road projects and building projects.
Engineering Estimate for Road Items: Auguest 2013
We believe we can add reliable information on your preparation of a reasonable bidding quotation. We give you a reference “current” reasonable price (All material, labor, and equipment base price preferred in Addis). We are showing you the Engineering Estimates for the Direct rate for Road Construction.. If your need is not in the list… Read…
Engineering Estimate for Road Items: May 2016
We believe we can add reliable information on your preparation of a reasonable bidding quotation. We give you a reference “current” reasonable price (All material, labor, and equipment base price preferred in Addis). We are showing you the Engineering Estimates for the Direct rate for Road Construction.. If your need is not in list below… Read…
Engineering Estimate for Building Items: July 2015
This Building Direct Engineering Estimate includes manpower, material, equipment, wastage, etc but does not include profit and overhead for the contractor. Item Description Unit D.Rate 01. EXCAVATION & EARTH WORK 1 Site clearing and removing of top 200mm thick soil m2 16.9925 2 Bulk excavation in expansive soil to a depth not… Read…